Funding checker for a rented home

Answer six questions about the property. The checker shows which routes the published rules open to a landlord, in your browser. If you want us to look at your answers, send them below and we reply by email.

Answer the questions above to see the routes open to this property.

Based on the rules as published on GOV.UK and the scheme documents listed on this page. Eligibility is decided by the scheme administrator, not by this checker. Not financial or legal advice.

The short answer

Most landlords fit a heat pump between tenancies. When that is not possible, the work can be done with the tenant living there, but it needs the tenant’s agreement, written notice for each visit and a plan that keeps the home warm.

The legal access rules are narrow. In England, section 11(6) of the Landlord and Tenant Act 1985 gives a landlord, or someone authorised in writing, the right to enter at reasonable times to view the condition and state of repair on 24 hours’ notice in writing. In Wales, section 98 of the Renting Homes (Wales) Act 2016 lets a landlord enter at any reasonable time to inspect, or to carry out works or repairs needed to keep the home fit and in repair, after at least 24 hours’ notice. A heat pump that replaces a working boiler is usually an improvement, so treat the whole project as something you agree with the tenant, not something you impose.

We publish landlord guides and do not install, survey or arrange works. The legislation and your tenancy agreement are the authority.

Landlord access: what the law gives you

NationRuleNoticeWhat it covers
EnglandLandlord and Tenant Act 1985, s11(6)24 hours, in writingEntry at reasonable times to view condition and state of repair
WalesRenting Homes (Wales) Act 2016, s98At least 24 hoursEntry at any reasonable time to inspect, or for works needed under s91 (fitness) or s92 (repair)

Neither rule is a general right to come and go. Both name a purpose and require notice. Emergencies, such as a gas escape or a burst pipe, are handled under separate rules, and they are not the route for planned works.

The Renters’ Rights Act changes in England took effect on 1 May 2026: most private tenancies became assured periodic tenancies and section 21 evictions ended. That makes it more likely your tenant stays through the works, and it is one more reason to plan the project with them. Our page on the Renters’ Rights Act and energy upgrades covers the wider changes.

Getting the tenant’s agreement

Put the plan in writing before any survey visit. A short letter covers it:

  • what is being installed and why (a heat pump replacing the boiler, a cylinder, possibly new radiators)
  • each visit: the survey, the heat loss check, the installation days and the commissioning visit
  • which rooms are affected and roughly for how long
  • how the home will be kept warm and hot water supplied during the work
  • who to contact, and how to raise a problem

A plain notice-letter template

Dear [tenant name],

We plan to replace the gas boiler at [address] with an air source heat pump and hot water cylinder. We would like to agree the following visits with you:

  1. Survey and heat loss assessment: [date, time window]
  2. Installation: [dates], affecting [rooms]
  3. Commissioning and handover: [date]

During the installation, [temporary heating / hot water arrangements]. The installer, [firm name], will attend on our behalf; we authorise them in writing to do so.

Please let us know by [date] whether these dates suit you, or suggest others. We will give you at least 24 hours’ written notice before each visit.

[Landlord name and contact details]

Keep a copy of the letter and the tenant’s reply.

Keeping the home warm during the switch

Your repairing duty for the heating and hot water installations under section 11 does not pause for an improvement project. In England, excess cold is one of the hazards councils assess under the Housing Health and Safety Rating System, and the HHSRS guide’s heating baseline is a system able to heat the main living room to 21°C and other habitable rooms to 18°C when it is minus 1°C outside.

Practical ways to stay on the right side of that:

  1. Pick the season. Do the work in mild weather if you can.
  2. Keep the old system running until the heat pump is commissioned, where the installer can sequence the work that way.
  3. Provide temporary heating and an immersion or other hot water route if there will be a gap, and say in the letter who pays to run it.
  4. Commission before you leave. Make sure the tenant knows how to use the controls before the installer goes, and leave the manual in the property.

The installer can give you a written programme for the job; ask for one before you fix dates with the tenant.

Lining up the grant with the tenant’s dates

The Boiler Upgrade Scheme pays £7,500 towards an air to water heat pump, or £9,000 where oil or LPG is replaced in a home with no mains gas until 31 March 2027. A landlord is eligible as the owner of the property. The installer applies and must commission the heat pump within 120 days of applying.

So agree the visit dates with the tenant first, then let the installer apply. Applying first and then finding the tenant cannot do the installation week leaves you racing the 120 days. The Boiler Upgrade Scheme for landlords page covers the rest of the rules, and the funding checker on this page shows which routes apply to your let.

The paperwork when the gas goes

If the heat pump replaces every gas appliance and the supply is capped, the annual gas safety check no longer applies. Regulation 36 of the Gas Safety (Installation and Use) Regulations 1998 still requires you to keep past records: until two further checks have been made, or, for an appliance that is removed, for 2 years from its last check.

If the tenant refuses access for energy efficiency works and that is why a rental cannot reach today’s minimum standard, the current rules allow a third-party consent exemption for 5 years, or until the tenancy ends if tenant consent was the issue. That is a last resort. Agreement is better for both of you.

Before you start

Read our checklist on before you install a heat pump in a rental for consent, planning and space, and heat pump radiators and hot water in rentals if the job includes new emitters or a cylinder.

Next step

If you are planning a heat pump in a let with the tenant in, use the enquiry form on this page. Tell us the property type, the current heating and when the tenant can accommodate the work. We reply by email.

Questions landlords ask

How much notice does a landlord need to give for works?

In England, section 11(6) of the Landlord and Tenant Act 1985 gives a landlord, or someone authorised in writing, the right to enter at reasonable times to view the condition and state of repair on 24 hours' notice in writing. In Wales, section 98 of the Renting Homes (Wales) Act 2016 requires at least 24 hours' notice before entering to inspect or to carry out works needed to keep the home fit and in repair.

Does the tenant have to agree to a heat pump being installed?

The statutory entry rights are framed around viewing the condition, repairs and keeping the home fit to live in. A heat pump that replaces a working boiler is usually an improvement, so get the tenant's agreement to the works, the dates and the access in writing, and check what your tenancy agreement says about improvements.

Can a landlord enter the property without permission?

Not as a routine. The rights above require notice and a reasonable time, and they are for the purposes the law names. In an emergency, such as a gas escape or a flood, different rules apply. For planned heat pump works, agree access with the tenant and give written notice for every visit.

How long does the grant give me to finish the work?

The installer applies for the Boiler Upgrade Scheme grant and must commission the heat pump within 120 days of applying. Agree the installation window with the tenant before the application goes in, so the dates hold.

Do I have to keep the tenant warm while the heating is off?

You must keep the heating installations in repair under section 11, and in England the HHSRS treats excess cold as a hazard. Plan the switch-over for mild weather if you can, keep the old system running until the new one is commissioned where possible, and provide temporary heating if there is a gap.

What happens to the gas safety certificate after the switch?

If every gas appliance is removed, the annual check no longer applies. Regulation 36 requires each record to be kept until two further checks have been made or, for an appliance that is removed, for 2 years from its last check.

Sources

Planning works with a tenant in?

Tell us the property, the current heating and your postcode. We reply by email with what applies to that let, including the grant timing.

What happens next

  1. We read your enquiry and the details you gave, including your postcode.
  2. We reply by email, usually with questions or the next step. We do not promise a reply time.
  3. You decide whether to go ahead. This site is a guide: it does not install, survey or quote.
Add a little more detail (optional, helps us reply)

We use your details only to answer this enquiry, and we do not pass them to an installer. This site is an independent guide — not an installer, assessor or scheme administrator. See our privacy notice.

Send an enquiry
Send an enquiry